www.siouxchief.comSupply Drainage SupportINSTALLATION GUIDEStreamLine Linear Drain TMWith Full Mortar Bed Adapter Kit
8. Secure Shower Pan LinerA. Seal Drain BaseLift out Shower Pan Liner. Remove tape, leaving tape over drain hole only.Apply a 1/8" continuous bea
10. Install Clamping CollarAlign collar with drain base under Shower Pan Liner. Press rmly. Starting at one end, insert 5/8" screw through colla
17. Install Mortar BedFollow industry standards to install mortar bed ush to top of Mortar Guard 1-1/4" thick. Pack mortar into top and bottom o
20. Install Pre-StrainersPlace short leg of Pre-Strainer down, facing drain hole. Install 1/2" pan head screw, align strainer and tighten screw.
25. Re-Install StrainerNote: Strainer attachment holes are not symmetrical. If screws do not align with holes in drain base, turn strainer end-to-end.
Cleaning DrainTo clean drain, remove 3 screws in top of strainer. Clear any hair or other obstructions from drain.Remove StrainerRe-Attach StrainerNot
www.siouxchief.comDISTRIBUTED BY24110 South Peculiar DrivePeculiar, Missouri 64078P 1.800.821 . 3944 F 1.800.7 5 8 . 5950A.12/12 STREAMLINE
1 www.siouxchief.comBracket Screw#8 1/2" Phillips Pan HeadScrewsStrainer HeightAdjustment Screw#10 2-1/2" Phillips FlatHead Screws. Note
Drain SizesConrm Drain Size, Waste Pipe Type and Waste Pipe LocationDrain hole is off-set to accomodate oor joist location.Size of shower determines
1. Wall PreparationBlockingBlocking between studs may be needed for Shower Pan Liner attachment prior to drain installation.2. Sub-Floor PreparationCa
4. Preparation for Pre-Sloped BedMark Bed Slope1/4" per foot slope to drain is required.Option B: Waste Pipe Pre-InstalledDry t drain base over
5. Fasten Drain Base to Sub-FloorFor Concrete Sub-Floor A & B For Wood Sub-Floor B onlyA. Mark for AnchorsDry t drain base over waste pipe. Mark
Making CornersTucked Corner (when space is available between studs) Fold and crease to size. Tuck Shower Pan Liner into space between studs.Folded Cor
Drain at Full Curb EntryLayout 2Shower Pan Liner must turn up the walls a minimum of 3" above nished shower curb and 6" above oor in showe
Drain at Partial Width Curb Layout 3Shower Pan Liner must turn up the walls a minimum of 3" above nished shower curb and 6" above oor in s
Comments to this Manuals